MEP systems are among the most coordination-heavy parts of any build. Without early clash detection between mechanical ducting, electrical routing, and plumbing lines, on-site conflicts can halt progress for days.
The projects that stay on schedule are almost always the ones where MEP was planned in parallel with structural design, not after it.
— SAGEC MEP Team
Investing in proper coordination at the design stage remains one of the most effective ways to protect a project’s timeline.